my life as a crocheter & knitter & working mom

Showing posts with label fur's bday gift. Show all posts
Showing posts with label fur's bday gift. Show all posts

Wednesday, August 29, 2007

I did some sewing last night

I think I mentioned that I wanted to sew up some gift bags this week. Well, I sat down last night and did it. Two square-ish based on a lunchbag pattern I found online and one wine bottle that I winged. The square one on the bottom has M-i-l's CeCe in it and will be gifted tomorrow (as will the winebag). The other sqaure one will hold my sister's socks and will be gifted Saturday. I'm planning to make many more of these kinds of things. I hate the waste of wrapping gifts in paper and it's one way to use up my fabric stash that just keeps growing. I need to figure out different shapes and sizes for the square ones. CeCe is a small sweater, Mom's Freya won't be!
I did knit on the knee socks yesterday. I'm over half-way to the toe. I hope to finish it tonight.

How many nights in a row should B be dry before we try taking him out of the pull-ups again? He's still doing great on the potty when he's awake and has been dry the last four or so mornings.

Tuesday, August 28, 2007

now with motion

I'm not sure this is a great video, but it B wanted to say hi.Here's where I am with sock 2. Just past the heel. I'm a bit peeved that the darker blue is so speckled in this third skein. They were all the same dyelot!

Tuesday, August 21, 2007

rapidly approaching an ankle

I've only got a couple more decrease rows to go, then it's an inch of stockinette at the ankle. I should be working the heel sometime tonight. I know, that means the sock won't be done before our trip tomorrow. I'm okay with that; I'll definitely be done before the party 8/30. I'm still bringing the Hempathy and the Josephine pattern down the shore, but I'll alternate with the sock.

B's been doing really well on the potty the last week or so. He's pooped nowhere else for over a week and hasn't had a wet accident (meaning when awake) with me since early last week. I think it's the best birthday present ever.

Now, if only daycare would get with the program. Dude was dry all day Friday. He even got some candy for doing so well. So, I was totally stoked when I picked him up yesterday and he was still in the same clothes I'd dressed him in that morning. He was dancing a jig, but wouldn't go, then he told me he was wet when we got home. He didn't look wet, so I took him upstairs and put him on the potty. That's when I realized he'd been in a pull-up! Apparently all day! I've sent in a note asking for an explanation, and if I don't get a note back, I'm calling tomorrow. I'm tired of them undermining us. They're the ones with the stupid ass deadline. They need to step up and do something about what's going on there during the day. He doesn't have accidents with me and I can't make him use the potty when I'm not there!

I'm so looking forward to getting away. I'm hoping being down the shore, as in not at home, doesn't set him back. He didn't go on the potty much for M-i-L Saturday afternoon. But, we'll deal with it.

Hopefully, I'll be back on Monday with pics of something other than these socks!

Friday, August 17, 2007

a wee, tee-tiny bit of progress

15+ rows of 1/1 ribbing over 108 stitches. That's some progress, right? I'd so love to knit my fingers off this weekend so I could do the heel and foot on Monday and Tuesday. That's not wishful thinking is it? I'm home alone tonight (another JETS pre-season game), so if the dog behaves, I might be able to get quite a bit done after B goes to bed.
I was in such a horrible place last night. Just miserable. So much I was thinking about the big D, you know, depression. But, I cheered myself right up this morning. Lots of hugs and snuggles with the boy to try to get some perspective. I do not focus on the big picture enough. And the big picture is that he's a great kid who loves us and knows we love him.

I did have a nice chat with one of the leads for the older class. B adores her and is so excited she's been taking him into the big kid class the last few days, getting him ready for the "new school year." He had two accidents yesterday, one at nap (for which we don't ever blame him) and another one right after they'd tried to get him to go. So, we've been underscoring that if he wants to be in her class, he needs to use the potty every time. He's still doing a great job at home, except overnights, which goes without saying. That we can't worry about for a few more years, really. It's just nice to know that someone there is taking a real effort with him, at least during the "school day."

We've got a busy weekend. Like I said above, Hubby's got the Jets game tonight. Tomorrow we've got some Prime-A seats behind the Yankees on-deck circle for their game against Detroit. I'm not sure how many rows back, so don't worry about trying to see me on the TV (it's on FOX, though, in case you're interested). Then Sunday, Hubby's going to the Yankees again (he'd planned the outing with friends before F-i-L got the free tickets throug work) and B and I will meet him at the in-laws for my birthday dinner. I need to do some tidying tomorrow morning. M-i-L's going to Billy sit at our house so she doesn't have to keep him over night (game's at 3:55 and we wouldn't get back before bedtime).

Thursday, August 16, 2007

I got nothing

I ripped out the cast on last night. I got a seat on the subway and started the 1 x 1 ribbing. I got half-way through and realized I'd knitted when I should have purled and I had to tink back 27 stitches. I dropped the 13th stitch. Since I had used a long-tail cast-on, I had to rip the whole thing out. Which was easy. But, I haven't touched it since. Well, I guess taking it out of my bag to photograph this morning counts as touching it.

I didn't knit anything last night, so it's not like I have a project monogamy issue. After B went to bed, I read "A Good Yarn." I'm so not getting these socks done.

When I picked B up last night one of the chickies informed me that the teachers ask that B wear a pull-up at school. He'd been averaging 1 accident a day since mid-week last week, but had 2 yesterday, one in the morning and one in the afternoon. Apparently, he's been doing that fun thing where he says he has to go to the bathroom, so you take him to the potty, and he sits there doing nothing, and then a short time later he pees in his pants. I think the straw that broke the camel's back was when he peed in the jungle gym yesterday afternoon.

I understand that it's inconvenient and unpleasant for them to have to clean up his urine. I don't enjoy it much myself. But, we're afraid putting him in a pull-up's going to set him back. So, this morning, we put him in his big-boy underwear (after repeatedly discussing with him last night and this morning that he has to stay dry or he'll be in a pull-up). I wrote a loooong note to his lead teacher explaining why he wasn't in a pull-up. Tomorrow, if he's had accidents, I'll have to wrestle him into one. I hate taking steps back like this.

Wednesday, August 15, 2007

ambivalence

Feeling ambivalent about a gift recipient really does put a drag on the gift knitting. I still love my sister, but I'm not feeling terribly motivated to knit this second sock. Partly because, I'm being lulled by how quickly the first sock progressed after I finished the calf increases. The rest of the sock took a week to knit! This cast-on has been sitting around nearly that long. I'd love to have this bad boy done before we go down the shore next Wednesday. Think I can do it?
See, if this is done by next Wednesday, I can plan on taking only "for me" knits to the Shore for our mini-vacation. I'd like to bring just Serrano, Josephine (if the yarn gets here in time), and one of the two pairs of socks I've started for myself over the last year. Granted, I never knit as much on vacation as I think I will, but this is what I want to have with me.
B continues to exhibit progress on the potty front. Only 1 accident at school and none at home. That's my big boy!
Funny story. I got an e-mail from a marketing firm saying that they love my blog and wanted me to review a product. Luvs diapers. I pointedly wrote back that if they were truly reading my blog, they'd know that we're in the midst of potty training and don't plan on buying any diapers. I got a nice response back, so it was a real person and not just spam.
On my trip next weekend, I wonder if Hubby will let me go here as a birthday gift.

Friday, August 10, 2007

not so bouncie ball

What do you think? Does my beach ball cake look at all like it's inspiration. I know the difference between the red (which is pinkish IRL) and orange is not visible in the pics, but it was nearly 11 pm and natural light was long gone. Bill thinks it's pretty cool. Look, a beach ball, he said when he opened the fridge.

I did finish the first sock. See? Toe all neatly grafted. I have cast on for sock two and that's about all. After B went to bed I did some laundry, baking (see above), dishes and reading.

I'm not sure if I'll do much of any knitting this weekend. My sister e-mailed me at 7:30 this morning to let me know she was up and in the shower (baby sis has always been very slow to get her behind in gear in the mornings). I'm so stoked to hang out with them this weekend. I can't wait. I'm leaving here in an hour. w00t!

I'm not going to obsess all day about B having 2 wet accidents yesterday (first one right as I walked in the door at daycare and the second on the last braided rug my dead grandmother made, eucalan to the rescue). Poor guy's constipated and was a whiny mess all morning. I sure hope he goes on the potty when he finally lets go.

Thursday, August 09, 2007

the toe approacheth

I did the first row of toe decreases this morning. I should be kitchenering it on the way home. Is kitchener a verb? Can you make a gerund out of it? Probably not, I should say I'll be grafting it on the way home. But kitchenering sounds much more interesting than grafting.

I've got a lot to do tonight. We had a change in plans for the weekend. Both of my sisters are coming down tomorrow. Since the middle one had a birthday on Monday, I'm baking a cake tonight and I'll be tidying up the main floor of the house. Hmmm, maybe I'll vacuum. The cake is going to be a beach ball, since we're planning to go to the beach one day (I need to find out when they're returning to VT).

Tomorrow, I'll be leaving work at noon and then I'll finish cleaning up the guestroom and any other tidying. Hubby and I installed the airconditioner last night, but there's all that clean laundry to put away. I expect I'll be busy tomorrow because I know myself enough to know that I probably won't do a whole lot tonight.

B is still doing well on the potty, in case you were wondering.

Wednesday, August 08, 2007

shapely sock

I got way more knitting done last night than expected. After I posted my good news to the blog, I had a lite beer and knit. I'm half done the foot (the heel was kitchenered on the train ride home).

I think one of the reasons I found the in-place after thought heel so fiddly last summer was because I used a stitch holder. Which sat in my way until the heel was well-established. Using scrap yarn, the held stitches just dangled out of the way and it was very easy to get the heel done.

Gosh I hope this thing fits. I'm not even going to think about "what if she doesn't like it." If she doesn't like it, I'll throw it in a dye pot and see what happens.

So, the morning started out well. Except for the constant thunder and lightning from 5 to 5:35. I waited it out before I got in the shower, it was just too intense. I was pretty freaked after my shower to hear a funnel cloud had been sighted. The good news was B woke up dry and excited to start another day of being a big boy.

We had breakfast and I smartly flicked on the news. 1 hr delays on the bus. Train it was. But we had delays there, too. No explanation as to why a 15 minute ride from Newark to NY took over a half an hour. Then, no subways. So, I took the Path and walked from Christopher street to my office. All in all a very sweaty 2 and a half hour commute. Some people out in Queens are still waiting for subway trains. I hope things improve before the evening rush.

I just don't understand why they MTA and the city do not have systems in place to keep the trains running. I know 3 inches in an hour is a lot of rain, but it happens at least once a year!

Tuesday, August 07, 2007

Promised Heel

Here's the heel for the sock. I'm doing an in-place afterthought, because I felt like it. Actually, I really like the way it looks with the self-striping yarn. I used it on the chevron socks last summer (here and here). The red is holding the live stitches for the top of the foot and the orange is my crochet cast-on (those stitches will become the bottom of the foot). I wish I could remember what proportion of stitches to decrease. Oh well, I'll wing it. Here's the sock from knee to heel. I'd like to have it done by the Friday, since I can't work on it this weekend.
I didn't knit too much last night. I called my parents, read a little, and tied up the recyclables. Fun and exciting, I know.

In Billy news, he was not in big boy underwear at daycare yesterday. They didn't go to the pool and when they changed him out of his pool clothes, they didn't see the underwear I'd packed and they put him in a pull-up. He wasn't too upset about it, but was confused this morning asking first to wear a pull-up and then wanting Sponge Bob underwear. We went with the underwear. No calls yet. We'll see what kind of report I get when I pick him up this evening.

I may not be knitting too much tonight either. I have to call my grandparents about staying with them over Labor Day weekend and I have to start clearing out the guestroom (there's other housework to be done as well this week). Lil' sis is coming down by herself, but that doesn't mean I need to expose her to my utterly slovenly ways.

Friday, August 03, 2007

downhill to the ankle

I finished the calf increases last night. There were only 4 sets. Now, it's the downhill to the ankle. I need to double-check some previous notes that I think are buried in the wool side of the stash to confirm my sister's petite ankles. I know she's got wee feet. She often can't find ladies shoes she likes and will buy boys sandals and things (think camo with those cool LED lights). So, I might be decreasing 60 stitches over the next 8 inches. I did plan to have an inch or so of straight knitting at the ankle, so I can decrease more there if I need to.

In other news, B's still not peeing on the potty, but it's not a big deal at our house. Or it hasn't been the last couple of days. We are going to try him in big boy underwear tomorrow to see if it causes him to be more aware and more willing to pee on the potty. He was talking about bigboy underwear last night. I reminded him that he needs to pee on the potty everytime and to poop on the potty, too. We then talked about which of his friends are still in pull-ups and who's in undewear and that he can't be in pull-ups to be in Miss Judy's class.

He's been watching potty movies continuously at home. Here's hoping something sinks in.

I took Julie's comment to heart the other day. I'm not truly a bad mom. Bad moms don't have guilt about their own failings and bad behavior. But, three broken glasses in the dishwasher (I was a bit too demonstrative Monday night), do tell me that I need to do something about my anger. Fortunately, PMS has passed, so it will be a little easier the next couple of weeks. Unfortunately, I'm allergic to the meds marketed for Pre-Menstrual Dysphoric Disorder.

Thursday, August 02, 2007

now with calf shaping

I started the calf shaping on my sister's birthday socks. I need to knit faster if I'm going to get two of these done by Labor Day weekend (the party is that Saturday).

I hope I'm not too off with the sizing.

I was very irritated to find a knot in this first skein. But, it means I don't have to knock myself out to make the two socks matchy-matchy. (No, I'm not going to remove yarn in the second sock to re-create the screw up in the patterning the mill's knot introduced. You're at the wrong blog if you're looking for that kind of thing, not that there's anything wrong with it.)

Things went okay at the doctor's office. Billy was really great, as usual. He saves his best behavior when there's a lollipop at the end. Truly, though, he did try to share the toys with this cute little rugrat. B was fascinated by the baby (about 10 months judging by size and crawling) and the baby was fascinated by B. He walked right up to the baby and gave him the doctor's Rhinocort Rhino to play with. Awwww.

Turns out his ear pain is swimmer's ear and not a middle ear infection. We've since learned that when you're three and a half antibiotic drops are great in theory, not so much in practice. He loved the idea of ear drops, scurrying to get on the floor and then flailed and wailed when they were put into his ear. The most fun part of yesterday, for B, though, was trying to pee in a cup. The doc jumped all over the one symptom of a possible UTI. B thinks it's hilarious and won't do it. We've got a specimen cup at home, just in case I can catch some. She suggested saran wrap on the bowl, I'm going to try that tonight.

No good suggestions, just patience and rewarding him.

After the doc, B and I got hair cuts. He really liked mine. He was so cute giggling and telling me "nice haircut." He even told my I had my sisters hair (the one of the three of us not to get the curls). Hubby, on the other hand, hates it. He always hates it when I have my hair blown out. Oh well, the curls be back soon enough. I took this pic this morning. The hair looked much better yesterday. The effects of straigt ironing have worn off after sleeping and the humidity of the bathroom.

B couldn't tell. He still liked it this morning.

Wednesday, August 01, 2007

Happy August

August is a very exciting month for us. We have four birthdays this month: my middle sister; Me; my Meme (paternal grandmother); and M-i-L.

B woke up this morning saying his ears hurt and that I needed to take his temchur. 99.4. We have a 2:30 appointment with the doctor. I know common wisdom says you can just let the kids ride out ear infections, but with his history (and my nervous Nellie spouse), off to the doctor we go.

Hubby found himself some clarity yesterday. He did some reading online and low and behold, his wife was right. We need to back off the kid a bit. Now, I need to go take my own advice and find a way to not get so upset. Granted, my mood last night was not helped by seeing B was sitting around in wet shorts for the second time in a week. I swear those afternoon chickies do the absolute minimum. Hubby was going to talk to one of the directors about it.

I'm going to ask the doctor if she has any tips about getting him to go, but we're probably going to try to go with big boy underpants on Saturday. (Rae, Hubby is very good about the laundry.) Consensus is that the pull-ups aren't making him uncomfortable enough (M-i-L dropped off some new DVDs and suggested as well as the suggestions from the comments yesterday).

I know I'm the problem at this point. I get so upset over his accidents and the playing on the potty. I'm sure that's why he's regressing. I realized that I take this all too personally and I have to give him some space and lots of love and support. It was hard to do this morning. It being a pool day and all. I cannot relax when he's walking around in the house in a swimmie diaper.

Oh, look knitting content to distract you from the fact that I'm a horrible mother.
I'm not a terribly awesome knitter either. I had to rip out over an inch and cast on again. Seems if you bother to knit a swatch, and wash it, you should measure the dry swatch. My stitches bloomed so much I lost a 1/2 stitch per inch and the sock would have been nearly an inch too wide.

Monday, July 30, 2007

snapshots, sweaters, sisters

My new camera was waiting for me when I got home. My only complaint is how long it takes to snap the picture. I took it out of the box Friday, but really didn't play with it until Saturday. B and I had fun with the watercolors, so I had to take some pics of our work. Here he is contemplating his next move.

I can't help it, we sit and paint for a while and then it devolves into him trying to ge my arm and me making him even more cute.

I must admit not too much success on the potty front, as many pull-up changes as peeing on the potty. But, I did learn one thing, if he says "i hafta go bafroom," just take him. Don't ask for confirmation, because then he'll deny and I'll be changing a wet pull-up. Just go, no questions asked.

CeCe is done. She had a bath yesterday at naptime and is currently drying on the blocking board. She's 10" from underarm to waistline. I hope that's enough for M-i-L; it wouldn't be enough for me, but she's much thinner. I hope she likes it. M-i-L does so much for us, I love giving her the handknits. I don't know if she knows how much I appreciate her. I'll have to tell her, won't I?

I did the math and cast on 116 stitches for my sister's birthday present. I'm not sure if she's still occasionally checking in, but since she decided the party shouldn't be a surprise, I guess her gift doesn't have to be either. Although she probably has some idea since I needed her leg measurements.
She's coming down the 10th. Not sure if her husband or our other sister is coming with her. But, we'll have fun anyway!

Nearly forgot to mention that my ear cleared up last night and I'm nearly back to normal, finally. It's so nice to not be able to hear myself so much when I talk.

Thursday, July 12, 2007

systems failure

For the second morning in a row, all of the systems my team and I need to do our jobs are inaccessible. Yesterday, they came back online at twenty minutes of one. Yep, nearly four hours lost. And they are down again this morning. I sure hope they're back up earlier today.

In paranoid moments, I think it's just a plot by my European colleagues to slow us down. We've out produced them so far this month.

The other system failing is the potty thing at home. B will parrot us in saying, repeatedly throughout the day, that he's going to start pooping on the potty. And then he doesn't. And now, he's not peeing on the potty so much anymore. I know I'm supposed to be supportive and all positive reinforcement, but I'm pissed. He gets it, I know he does, so why isn't he doing it?

On a positive note, I have to thank Tracy for her elegant solution to my CeCe problem. I started again, same needles, smaller size. The pattern has the sizes only 2" apart, so the 36" size at the same gague with my ginormouse YOs will give me a 38" bust size. Perfect for lazy me who didn't feel like swatching again and couldn't find bamboo US 9 circs locally.

I've been making some good progress. I've started the second set of eyelets.

Thanks Amy for her suggestion, too. I might try that after I make a real swatch with the US 2s.

Wednesday, July 11, 2007

dilemma

So, I was happily knitting along on CeCe last night when I completed the third repeat and the first ball of yarn. I was a little concerned, because I only had 4" completed. The total body length of CeCe at the 38" size is supposed to be about 19". My four balls of Calmer didn't seem like they were going to get me there. (Pattern calls for 650 yds of DK yarn, 4 balls of Calmer = 700.)

So, I looked at the piece I'd completed and it seemed a bit large. And it was! Although my stitch gauge is spot on at 5 st/in, the back is over 21" wide! M-i-L would swim in a 42" chest. The problem appears to be that my yarnovers are huge. Calmer is very soft and stretchy and the KnitPicks options glide too easily giving super huge YOs.

A re-start is in order. So, I started ripping it out, and I will finish that process tonight (ballwinder's in the office).

Question is, do I go down to an 8 (at which my gauge will be tighter still using more yarn than I want), or do I reduce the number of stitches using the KP 9 to get the right width but still ginormous YOs, or do I go get a bamboo 9 to see if that will help? (Problem is I don't think PURL carries bamboo circs.)

I'm kind of stumped. But, I'm going to make this work. I want to give M-i-L a CeCe in this yarn.

I brought sis's birthday swatch in to work on today. I tried at US 2 and it seemed floppy. I think a US 1 will work, but it will mean tinkering with the pattern if my gauge is tighter than 8 st/in.